Global procurement

How we source

From a line on your vendor list to a crate on your site, in four steps.

1. Read the requirement

We check the specification before we chase a price: size, rating, end connection, body and trim materials, the standard, and any approved vendor list the consultant has issued.

2. Approach the makers

Manufacturers and their authorised distributors first, stockists second. Offers come back on one comparison sheet, with delivery, warranty and documentation side by side.

3. Verify before dispatch

Material test certificates, hydro test reports and, where the order calls for it, third-party inspection are arranged before the goods leave.

4. Deliver to schedule

Dispatch documents, packing lists and certificates travel with the consignment, so the stores and the client's inspector have what they need on arrival.

A size or rating not listed?

Our procurement desk sources it, from Valvetech or anywhere in the world.